East Bull Palladium Property
East Bull Palladium
90km west of Sudbury Ontario is the 992 hectare East Bull Palladium project.
Acquired in 2019, it has been the focus of a 20,000m+ drilling program that began in Feb 2020. There were excellent results throughout the program with the deposit extend along strike from 2.2km to over 3.5km in addition to filling in a number of mineralization gaps.
The deposit was extended down dip and along strike and new zones were discovered. The updated NI43-101 is below.
Of significant interest is the discovery of the EOH and Gap zones which have been identified as feeder zones to the main bulk tonnage deposit. A ‘Lac des Iles-type’ development scenario is therefore being targeted with bulk-tonnage PGM surface deposit overlying a potential high-grade underground deposit.
Expanding the deposit
2019 to 2023
![WhatsApp Image 2023-09-26 at 08.57.48](https://questcriticalmetals.com/wp-content/uploads/2019/02/WhatsApp-Image-2023-09-26-at-08.57.48-1024x568.jpeg)
![east bull](https://questcriticalmetals.com/wp-content/uploads/2019/02/east-bull.jpg)
High-grade semi-massive mineralization in GAP target – 1.0 m @ 9.8 g/t Pd, 3.0 g/t Pt, 0.3 g/t Au, 2.0% Cu, 0.4% Ni in EB21-80
Corporate
Investors
News
![6](https://questcriticalmetals.com/wp-content/uploads/2023/12/6.png)
![EN_fundedbyEU_VERTICAL_RGB_NEG](https://questcriticalmetals.com/wp-content/uploads/2023/11/EN_fundedbyEU_VERTICAL_RGB_NEG-150x150.png)